Subcontractor onboarding process map

A swimlane map of bringing an external contractor onto a yard, from selection to checkout, across procurement, HSE/safety, security/access and the project manager. It treats access, competence and permits as three separate gates a contractor has to clear, in that order, before doing any work at all.

Open this map in the editor

Opens a copy in the editor and saves it in this browser. No account, nothing sent anywhere.

What is in this map

18 steps across 4 swimlanes and 5 phases, with 4 decision points.

Swimlanes (who does the work)
Procurement, HSE / Safety, Security / Access and Project Manager
Phases (left to right)
Selection, Documentation, Induction and access, Deployment and Checkout

Why map this process

The three onboarding gates — valid documentation, a passed induction, and a permit where the work calls for one — are deliberately sequential rather than a single 'contractor cleared' checkbox. A contractor with current insurance and a passed induction still cannot start hot work or confined-space entry without the specific permit that work requires, and collapsing the gates into one step would let a permit-requiring job start on general site clearance alone.

Daily supervision is a recurring check, not a one-time sign-off at deployment, and its note explicitly covers conduct as well as work quality — PPE compliance, permit adherence, safety behaviour. That distinction matters because a contractor can do technically competent work while creating a safety risk through how they work, and a map that only checks output quality would miss the reason most contractor incidents actually happen.

Every step in the map

This is the spreadsheet behind the diagram. The numbers in “Goes to” are row numbers, which is exactly what the editor’s “Line to” column holds — so you can read the flow here and retype any part of it.

Every step in the Subcontractor and external workforce onboarding (selection to checkout) process map, in the order the editor numbers them.
#StepShapeSwimlanePhaseGoes to
1 Subcontractor selected and engaged for a work package Start Procurement Selection 2
2 Request certifications, insurance and competency records Process Procurement Selection 3
3 Verify certifications and insurance are current Control Procurement Documentation 4
4 All required documentation **valid and current**? Decision Procurement Documentation 6 (Valid), 5 (Missing/expired)
5 Chase outstanding or expired documentation Process Procurement Documentation 3
6 Deliver site safety induction to contractor personnel Process HSE / Safety Induction and access 7
7 Contractor personnel **pass the induction** and site test? Decision HSE / Safety Induction and access 9 (Pass), 8 (Fail)
8 Repeat induction for personnel who did not pass Process HSE / Safety Induction and access 7
9 Issue site access passes and *PPE* Process Security / Access Induction and access 10
10 Assign work area and brief on adjacent operations Process Project Manager Deployment 11
11 Work requires a *hot work* or *confined space* permit? Decision Project Manager Deployment 12 (Yes, permit required), 13 (No, standard work)
12 Obtain the relevant permit before work starts Approval HSE / Safety Deployment 13
13 Contractor carries out work under FAYARD supervision Process Project Manager Deployment 14
14 Daily supervision check of contractor work and conduct Process Project Manager Deployment 15
15 *Work package* complete and area handed back clean? Decision Project Manager Checkout 17 (Complete), 16 (Not complete)
16 Contractor continues work, repeat daily checks Process Project Manager Checkout 14
17 Return access passes, close out and record performance Process Security / Access Checkout 18
18 Subcontractor checked out, work package closed End Security / Access Checkout End

The decision points

Every branch in the map, with the label on each outgoing line. These are the questions the process has to be able to answer.

  • 4. All required documentation **valid and current**?

    Owned by Procurement · Documentation

    • Valid → step 6
    • Missing/expired → step 5
  • 7. Contractor personnel **pass the induction** and site test?

    Owned by HSE / Safety · Induction and access

    • Pass → step 9
    • Fail → step 8
  • 11. Work requires a *hot work* or *confined space* permit?

    Owned by Project Manager · Deployment

    • Yes, permit required → step 12
    • No, standard work → step 13
  • 15. *Work package* complete and area handed back clean?

    Owned by Project Manager · Checkout

    • Complete → step 17
    • Not complete → step 16

Notes on specific steps

These notes travel with the map. In the editor they live in the Notes column and appear when you open a box.

14. Daily supervision check of contractor work and conduct
Covers conduct as well as work quality — PPE compliance, permit adherence, and staying inside the assigned area are checked **every day** the contractor is on site, not only at handover.

Making it yours

The documentation-chase loop and the induction-repeat loop both return to the same step they came from, not forward — keep them that way if you adapt this map, because a contractor with expired insurance needs the insurance re-verified, not a shortcut past it. The daily-supervision note names the yard performing the supervision; when you adapt this map for your own yard, that is the one line in the whole chart worth editing by name rather than leaving as a placeholder, since it is the one place a specific company name appears in the authored content.

What to watch out for

  • Do not treat the permit decision as optional paperwork bolted onto access issuance. Site access and a work permit answer different questions — can this person be on site, versus can this specific task happen right now — and a contractor with a valid pass but no permit for hot work is still not cleared to strike an arc.
  • The daily-check loop is what actually enforces ongoing compliance, not the induction at the start. If your adaptation compresses deployment into 'contractor works, then checks out', you lose the only recurring control that catches a contractor drifting out of compliance over a multi-day job.
  • Checkout returns access passes and records performance — both matter. A yard that only recovers the badge and skips the performance record loses the information it needs the next time this same subcontractor is being selected for a future job.

Frequently asked questions

Why is there a decision for 'needs a permit' after access is already granted, rather than checked earlier?

Because site access and work authorization are genuinely different: a contractor can have valid site access weeks before their specific task is scheduled, and whether that task needs a hot-work or confined-space permit depends on the work assignment, which happens after access, not before. Checking permit need before an assignment exists would mean checking against a task that is not yet defined.

How do we track which contractors are repeat versus first-time at our yard?

That is a filesystem or records question outside this chart's scope, but the recorded performance at checkout is the data source for it — keep that record and a repeat contractor's next onboarding can reference it, even though the map itself does not need a separate 'is this a repeat contractor' branch.

Our insurance requirements differ by trade — electrical contractors need different coverage than riggers. Does that need a branch?

No — put the trade-specific requirement in the Notes column on the documentation-request row rather than branching the flow. The steps are identical regardless of trade (request documentation, verify it, chase what's missing); only the acceptance criteria differ, and criteria belong in guidance text, not in the process shape.